Close Menu
geekfence.comgeekfence.com
    What's Hot

    Buying a phone in 2026? Follow this one rule

    February 10, 2026

    3 Questions: Using AI to help Olympic skaters land a quint | MIT News

    February 10, 2026

    Introducing the new Databricks Partner Program and Well-Architected Framework for ISVs and Data Providers

    February 10, 2026
    Facebook X (Twitter) Instagram
    • About Us
    • Contact Us
    Facebook Instagram
    geekfence.comgeekfence.com
    • Home
    • UK Tech News
    • AI
    • Big Data
    • Cyber Security
      • Cloud Computing
      • iOS Development
    • IoT
    • Mobile
    • Software
      • Software Development
      • Software Engineering
    • Technology
      • Green Technology
      • Nanotechnology
    • Telecom
    geekfence.comgeekfence.com
    Home»Green Technology»Looq AI Unveils qPole for Smarter Engineering Decisions and Reliable Grid Modeling
    Green Technology

    Looq AI Unveils qPole for Smarter Engineering Decisions and Reliable Grid Modeling

    AdminBy AdminFebruary 8, 2026No Comments4 Mins Read3 Views
    Facebook Twitter Pinterest LinkedIn Telegram Tumblr Email
    Looq AI Unveils qPole for Smarter Engineering Decisions and Reliable Grid Modeling
    Share
    Facebook Twitter LinkedIn Pinterest Email


    Looq AI Unveils qPole for Smarter Engineering Decisions and Reliable Grid Modeling

    Shannon Bresnahan
      |   Uncategorized

    On February 3, 2026, Cleantech San Diego member and Southern California Energy Innovation Network company Looq AI, a global leader in geophysical reasoning, announced the launch of qPole. The AI-enabled solution is designed to make the power grid more reliable and resilient by training AI models to understand utility poles the same way experienced engineers do, based on physical structure, geometry, materials, and real-world context.

     

    The U.S. power grid consists of an estimated 180–200 million distribution poles—some aging, some in areas where extreme weather conditions exist. Utilities face growing pressure to comply with state mandates for wildfire risk reduction and storm hardening. Accurate pole data has become a critical foundation for grid reliability. Yet it is still largely collected and processed using a slow, manual, and inconsistent workflow. Currently, thousands of utility contract companies work around the clock to complete detailed Pole Load Analysis (PLA).

     

    Geophysical reasoning is a way to understand physical objects, such as poles, in both 2D and 3D, recognizing their location in the world and the context of their surroundings. “We have trained the computer to look at a set of images and understand the pole’s DNA—its height, diameter, material,” said Dominique Meyer, CEO of Looq AI. “It also detects critical components like crossarms and transformers—just as an experienced engineer would.” This understanding allows the system to generate an engineering-ready representation of each pole, rather than just a collection of measurements.

     

    Field to Office: A Transformative Pole Modeling Workflow

     

    Today, capturing pole information is time-intensive and often hazardous. Crews rely on manual fielding, hot-sticking, or image-based capture to collect pole heights and pole attachments, often navigating difficult terrain, extreme weather, and local wildlife, including snakes. Field capture alone takes roughly 15 minutes per pole. Looq streamlines this process, reducing fieldwork to approximately two minutes per pole through a safer, reliable, and repeatable workflow.

     

    “Looq’s AI uses this human-like understanding to create a blueprint of a CAD model for each pole,” Meyer said. “It captures the data necessary to evaluate asset health, identifies current or potential future failures, and clearly communicates the path to remediation.”

     

    Beyond the field, back-office processing previously added another 15 minutes per pole, as engineers manually validate data before using PLA tools like SPIDAcalc, O-Calc, or PLS-CADD. The qPole AI-assisted processing is completed in about 5 minutes per pole and automatically detects and models each structure and its equipment.

     

    By streamlining capture and processing from a total of 30 minutes to just 7 minutes per pole, Looq is transforming utility workflows. “This average saving of 23 minutes per pole represents unlocking an estimated 19 million work hours saved annually in the U.S. alone,” said Meyer. “These reclaimed hours allow utilities to reallocate urgent investment toward grid hardening rather than manual data entry. In an industry facing a critical labor shortage, shifting focus ensures that maintenance backlogs are addressed without needing to increase headcount.”

     

    Field measurements are accurate to under a centimeter. This accuracy helps derive correct construction requirements, avoiding overbuilt or unnecessary projects. In many cases, poles were previously replaced at the ratepayers’ expense when accurate measurements would have confirmed sufficient structural integrity.

     

    “EPI is excited to see the next evolution in distribution fielding with Looq AI,” said Erik Kolb, PE, senior engineer at The Engineering Partners, Inc. “Our industry is primed for this exact kind of technology. We look forward to integrating our fielding practices with qPole, which will allow EPI to very quickly update its existing pole information.”

     

    “Solutions like this have the potential to significantly improve how utilities approach asset modeling, safety, and grid reliability,” said Audra C. Drazga, president and founder of Summit Path Advisory. “I met Looq in 2025, and it has been exciting to watch their vision evolve. I am encouraged to see how qPole delivers practical, real-world value to the industry.”

     

    Share this….



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    California’s new disclosure laws — what companies should know

    February 10, 2026

    Why China’s Aluminum Industry May Have Reached Peak CO2

    February 9, 2026

    UK PFAS Plan leaves critics cold

    February 7, 2026

    6 Benefits of Adding Electric Vehicle Chargers to Commercial Properties

    February 6, 2026

    B.C. housing standards need to keep pace with EV uptake, warns new roadmap

    February 5, 2026

    5 interview questions IBM’s CSO asks candidates

    February 4, 2026
    Top Posts

    Hard-braking events as indicators of road segment crash risk

    January 14, 202617 Views

    Understanding U-Net Architecture in Deep Learning

    November 25, 202512 Views

    Achieving superior intent extraction through decomposition

    January 25, 20268 Views
    Don't Miss

    Buying a phone in 2026? Follow this one rule

    February 10, 2026

    Summary created by Smart Answers AIIn summary:Tech Advisor advises following the ‘previous generation rule’ when…

    3 Questions: Using AI to help Olympic skaters land a quint | MIT News

    February 10, 2026

    Introducing the new Databricks Partner Program and Well-Architected Framework for ISVs and Data Providers

    February 10, 2026

    Threat Observability Updates in Secure Firewall 10.0

    February 10, 2026
    Stay In Touch
    • Facebook
    • Instagram
    About Us

    At GeekFence, we are a team of tech-enthusiasts, industry watchers and content creators who believe that technology isn’t just about gadgets—it’s about how innovation transforms our lives, work and society. We’ve come together to build a place where readers, thinkers and industry insiders can converge to explore what’s next in tech.

    Our Picks

    Buying a phone in 2026? Follow this one rule

    February 10, 2026

    3 Questions: Using AI to help Olympic skaters land a quint | MIT News

    February 10, 2026

    Subscribe to Updates

    Please enable JavaScript in your browser to complete this form.
    Loading
    • About Us
    • Contact Us
    • Disclaimer
    • Privacy Policy
    • Terms and Conditions
    © 2026 Geekfence.All Rigt Reserved.

    Type above and press Enter to search. Press Esc to cancel.