Close Menu
geekfence.comgeekfence.com
    What's Hot

    F1 on Apple TV: How to Watch Australian Grand Prix 2026

    March 6, 2026

    The Download: an AI agent’s hit piece, and preventing lightning

    March 6, 2026

    Microsoft Expands Windows 365 with New Cloud PC Devices from ASUS and Dell

    March 6, 2026
    Facebook X (Twitter) Instagram
    • About Us
    • Contact Us
    Facebook Instagram
    geekfence.comgeekfence.com
    • Home
    • UK Tech News
    • AI
    • Big Data
    • Cyber Security
      • Cloud Computing
      • iOS Development
    • IoT
    • Mobile
    • Software
      • Software Development
      • Software Engineering
    • Technology
      • Green Technology
      • Nanotechnology
    • Telecom
    geekfence.comgeekfence.com
    Home»Green Technology»Japan restarts nuclear power generation
    Green Technology

    Japan restarts nuclear power generation

    AdminBy AdminFebruary 13, 2026No Comments2 Mins Read2 Views
    Facebook Twitter Pinterest LinkedIn Telegram Tumblr Email
    Japan restarts nuclear power generation
    Share
    Facebook Twitter LinkedIn Pinterest Email



    Japan restarts nuclear power generation
    The Kashiwazaki-Kariwa plant in Nigata Prefecture (image credit: Tepco)

    Japan’s Kashiwazaki-Kariwa Nuclear Power Plant was restarted on 9 February, the first reactivation of a nuclear power facility in the country since the 2011 accident at Fukushima. It is scheduled to begin commercial generation again in mid-March.

    Located in Japan’s Nigata Prefecture, the plant is considered the world’s largest by installed capacity (approximately 7,965 MW),1 and is operated by Tokyo Electric Power (Tepco), the operator of the former Fukushima Daiichi Nuclear Power Plant.

    The 1,356-megawatt (MW) unit 6 reactor was restarted at 2pm local time on 9 February, and is scheduled to resume power generation and transmission on 16 February. A planned shutdown is to be undertaken on 20 February, prior to further inspection by the NRA. Commercial operation is expected to begin on 18 March.

    Unit 6 and 7 at the plant are both advanced boiling water reactors (ABWR), the first such deployment of the technology in the world. This is an evolution of the older-style BWR reactors used at Fukushima, and those present elsewhere at Kashiwazaki-Kariwa, which are not expected to be restarted. ABWRs feature additional safety systems including redundant core cooling systems and a more modern containment vessel said to be capable of withstanding severe earthquakes and tsunamis.

    Tepco has commented: “We will continue to conduct integrity checks of the plant equipment under actual steam operating conditions, while fully and sincerely responding to inspections by the Nuclear Regulation Authority,” Tepco officials stated.

    Approval to restart the unit 6 and 7 reactors at the plant was secured from the NRA in 2017, but awaited local approval, which was finally granted late last year by Niigata Prefecture.

    Sanae Takaichi became Japan’s first female Prime Minister in October 2025, with a mandate to greatly expand the role of nuclear in the country’s energy mix, and professed policy priorities of securing energy security, economic stability and stable electricity supply.

    Prior to Fukushima, nuclear power provided around 30% of the country’s electricity, but was stopped entirely within 14 months of the 2011 accident. This followed a 9.0 earthquake in the region, which in turn triggered a tsunami.

    Notes
    [1] The “largest plant” title is also potentially attributable to Bruce Nuclear Generating Station in Ontario, which is a leader in annual electricity generation.



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    BYD Launches Next-Generation Blade Battery & Flash Charging

    March 6, 2026

    Wiltshire pilot explores landfill gas-powered food production

    March 4, 2026

    Molecular Grip and the Reality of Low Surface Energy Labeling

    March 3, 2026

    With yet another global EV-focused agreement, Canada is rapidly realizing its new auto strategy

    March 2, 2026

    Nike taps manufacturing exec to head sustainability

    March 1, 2026

    Apollo Go Reaches 20 Million Trips, 190 Million Fully Driverless Kilometers

    February 28, 2026
    Top Posts

    Hard-braking events as indicators of road segment crash risk

    January 14, 202619 Views

    Understanding U-Net Architecture in Deep Learning

    November 25, 202518 Views

    How to integrate a graph database into your RAG pipeline

    February 8, 202610 Views
    Don't Miss

    F1 on Apple TV: How to Watch Australian Grand Prix 2026

    March 6, 2026

    Summary created by Smart Answers AIIn summary:Tech Advisor explains how Apple TV offers F1 Australian…

    The Download: an AI agent’s hit piece, and preventing lightning

    March 6, 2026

    Microsoft Expands Windows 365 with New Cloud PC Devices from ASUS and Dell

    March 6, 2026

    Hackers Used New Exploit Kit to Compromise Thousands of iPhones

    March 6, 2026
    Stay In Touch
    • Facebook
    • Instagram
    About Us

    At GeekFence, we are a team of tech-enthusiasts, industry watchers and content creators who believe that technology isn’t just about gadgets—it’s about how innovation transforms our lives, work and society. We’ve come together to build a place where readers, thinkers and industry insiders can converge to explore what’s next in tech.

    Our Picks

    F1 on Apple TV: How to Watch Australian Grand Prix 2026

    March 6, 2026

    The Download: an AI agent’s hit piece, and preventing lightning

    March 6, 2026

    Subscribe to Updates

    Please enable JavaScript in your browser to complete this form.
    Loading
    • About Us
    • Contact Us
    • Disclaimer
    • Privacy Policy
    • Terms and Conditions
    © 2026 Geekfence.All Rigt Reserved.

    Type above and press Enter to search. Press Esc to cancel.