Close Menu
geekfence.comgeekfence.com
    What's Hot

    Mara Blue Launches Feasibility Study for Ireland’s First Marine Biorefinery in Castletownbere

    March 4, 2026

    Charter and AMC Networks to host SCTE TechExpo 2026

    March 4, 2026

    How AI trained on birds is surfacing underwater mysteries

    March 4, 2026
    Facebook X (Twitter) Instagram
    • About Us
    • Contact Us
    Facebook Instagram
    geekfence.comgeekfence.com
    • Home
    • UK Tech News
    • AI
    • Big Data
    • Cyber Security
      • Cloud Computing
      • iOS Development
    • IoT
    • Mobile
    • Software
      • Software Development
      • Software Engineering
    • Technology
      • Green Technology
      • Nanotechnology
    • Telecom
    geekfence.comgeekfence.com
    Home»Telecom»Grid Telecom to build Artemis subsea cable connecting Crete to mainland Greece
    Telecom

    Grid Telecom to build Artemis subsea cable connecting Crete to mainland Greece

    AdminBy AdminFebruary 6, 2026No Comments3 Mins Read2 Views
    Facebook Twitter Pinterest LinkedIn Telegram Tumblr Email
    Grid Telecom to build Artemis subsea cable connecting Crete to mainland Greece
    Share
    Facebook Twitter LinkedIn Pinterest Email


    Press Release

    Grid Telecom, a wholesale telecommunications provider and subsidiary of IPTO, has announced the construction of ARTEMIS, an ultra-high-capacity subsea optical fiber cable system that will link Crete with mainland Greece.

    As a new strategic digital corridor in the Eastern Mediterranean, ARTEMIS is set to strengthen decisively regional connectivity, enhance Greece’s geopolitical footprint, and accelerate the country’s ongoing digital transformation.

    The ARTEMIS system will be equipped with subsea repeaters and will span approximately 280 kilometres, including its terrestrial segments linking the cable landing stations. Ιt will interconnect all landing stations and data centers in Crete and Attica region, enabling data transmission rates of up to 30 Tbps per fiber-pair. With a minimum of 24 fiber-pairs, ARTEMIS will deliver an overall design capacity of at least 720 Tbps, more than meeting all medium‑ and long‑term digital infrastructure needs.

    Engineered to support the next generation of cutting‑edge technologies, ARTEMIS will take full advantage of the relatively short transmission distance and the capability to expand the optical spectrum. As a result, the system is poised to become the first petabit-class subsea cable in Greece and the Mediterranean, with a potential total capacity exceeding 1 petabit per second, pushing well beyond the performance limits of today’s subsea optical fiber systems, setting a new benchmark for regional and international digital connectivity.

    Grid Telecom continues to invest in state‑of‑the‑art infrastructure with the goal of transforming Crete into a strategic digital hub, delivering network reliability, flexibility and diversity. Grid Telecom will leverage the synergies between the new ARTEMIS system and its existing Minoas East‑West and Apollo East‑West systems, which already connect the island to mainland Greece through four independent routes and a total of 96 fiber-pairs. The Minoas East‑West system links Chania to the Peloponnese, providing a low‑latency alternative route, while the Apollo East‑West system provides a direct connection between Heraklion and Attica, with no intermediate cable landing stations, adding another critical alternative path.

    In line with its commitment to advancing next‑generation telecommunications services, Grid Telecom is proceeding with the immediate construction of new cable landing stations in Chania and Attica. These facilities will serve both as landing points for the ARTEMIS cable system and as critical gateways for international subsea fiber cables traversing the Eastern Mediterranean, linking Greece with the Middle East and Western Europe. ARTEMIS will incorporate Open Cable Interface Equipment (OCIE), enabling seamless integration with all international cable systems, eliminating the need for additional transmission terminal equipment and providing direct, cost‑efficient backhaul access to all data centers.

    With these infrastructures in place, Grid Telecom as the premier neutral provider of wholesale telecom services in Greece, will deliver secure, open‑access landings and highly resilient connectivity through diversified fiber routes to both existing and emerging data centers in Crete, mainland Greece, and neighbouring countries. By fully leveraging its integrated terrestrial and subsea network assets, the company will ensure robust, scalable, and carrier‑grade connectivity across the region and provide comprehensive technical support and maintenance services at both infrastructure and operational levels.

    Keep up to date with all the latest telecoms news with the Total Telecom newsletter

    Also in the news
    World Communication Award Winners 2025
    Ofcom clears the way for satellite-to-smartphone services
    LG Uplus’s AI voice call app glitch leaks user data



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Charter and AMC Networks to host SCTE TechExpo 2026

    March 4, 2026

    iPad Air with M4 Launched in India: Price

    March 3, 2026

    ZTE outlines 6G strategy and unveils GigaMIMO, leading AI-native wireless for 6G evolution

    March 1, 2026

    WAN Market Size: 2025-2030 Forecast

    February 28, 2026

    Orange and Samsung expand Open RAN and vRAN partnership

    February 26, 2026

    GSMA launches global fund to power green mobile solutions

    February 25, 2026
    Top Posts

    Hard-braking events as indicators of road segment crash risk

    January 14, 202619 Views

    Understanding U-Net Architecture in Deep Learning

    November 25, 202518 Views

    How to integrate a graph database into your RAG pipeline

    February 8, 202610 Views
    Don't Miss

    Mara Blue Launches Feasibility Study for Ireland’s First Marine Biorefinery in Castletownbere

    March 4, 2026

    A feasibility study to explore the potential for Ireland’s first full-scale marine biorefinery has been officially launched by the Mara…

    Charter and AMC Networks to host SCTE TechExpo 2026

    March 4, 2026

    How AI trained on birds is surfacing underwater mysteries

    March 4, 2026

    Azure Databricks Lakebase is Generally Available

    March 4, 2026
    Stay In Touch
    • Facebook
    • Instagram
    About Us

    At GeekFence, we are a team of tech-enthusiasts, industry watchers and content creators who believe that technology isn’t just about gadgets—it’s about how innovation transforms our lives, work and society. We’ve come together to build a place where readers, thinkers and industry insiders can converge to explore what’s next in tech.

    Our Picks

    Mara Blue Launches Feasibility Study for Ireland’s First Marine Biorefinery in Castletownbere

    March 4, 2026

    Charter and AMC Networks to host SCTE TechExpo 2026

    March 4, 2026

    Subscribe to Updates

    Please enable JavaScript in your browser to complete this form.
    Loading
    • About Us
    • Contact Us
    • Disclaimer
    • Privacy Policy
    • Terms and Conditions
    © 2026 Geekfence.All Rigt Reserved.

    Type above and press Enter to search. Press Esc to cancel.